Accomplished Projects

IMSENG CO

abouzar 114 accommodation construction & engine room machinery & electrical parts, piping, valves, pumps, winches installation /conversion

NITC

NITC oil rigs and fields: maintenance, installation of machineries, pipe laying and steel works.

IRISL

GENERATOR INSTALLATION / OVERHAULING MAIN ENGINE OVERHAULING TWO STROKES GENERATORS CRANK-SHAFT RENEWAL 4 STROKES CRANES REPAIRS STEEL WORKS, SHIP’S HULL REPAIRS MAIN ENGINE AND AUXILIARY ENGINES FABRICATION & REPAIR OF CRANE BOOM INSTALLATION OF DIFFERENT AUX ENGINE ON VESSELS MAJOR OVERHAULING OF AUX. ENGINES OVERHAULING OF MAIN ENGINE 50 VESSEL 33000 HOURS POWER OVERHAULING, INSTALLATION, CRANKSHAFT REPAIR AND REPLACEMENT VARIOUS VESSELS

Setareh qeshm

Bunker line laying project in Qeshm Island approximately 16000 meters (high capacity with 14’’, 16” and 18” inch diameter) with civil work, insulation and protection according to international standards Setareh Qeshm Bunkering pressure vessel construction Setareh Qeshm Refinery Pipeline and Civil Setareh Qeshm Boiler, Pumps, Fire Fighting and Fuel Blender installation Setareh Qeshm Refinery Electrical Control room, cable treys and etc

Persia Hormouz

Pershia Hormouz Ship Repair Yard

Valfajr Shipping Co

Valfajr Shipping Maintenance of 20 vessels for 10 years